Model Ship Builder :: Forums :: Build Logs :: POB Build Logs |
|
<< Previous thread | Next thread >> |
Sloop Mediator 1745 by qwerty2008 |
Go to page 1 2 | |
Moderators: Winston, aew
|
Author | Post | ||
qwerty2008 |
| ||
![]() Registered Member #1095 Joined: Thu Aug 26 2010, 06:24pmPosts: 29 | The Lower Planking: (30:00 hours) I have started on the lower planking and am moving from the wale down. I am trying to use the least number of drop planks and stealers possible. Lextin. ![]() ![]() ![]() | ||
Back to top | | ||
qwerty2008 |
| ||
![]() Registered Member #1095 Joined: Thu Aug 26 2010, 06:24pmPosts: 29 | The Lower Planking Continued: (36:00 hours) Last night I decided to get back to work and since then I have planked the rest of the port side. two stealers where required in the stern. Lextin. ![]() ![]() ![]() | ||
Back to top | | ||
qwerty2008 |
| ||
![]() Registered Member #1095 Joined: Thu Aug 26 2010, 06:24pmPosts: 29 | Port Side Paint: (37:00 hours) When done with the planking I proceeded to stain the wood above the waterline and paint it white below the waterline. I still need to do some touching up on the color. Lextin. ![]() | ||
Back to top | | ||
Raymond Deliz |
| ||
![]() ![]() Registered Member #4329 Joined: Thu Dec 12 2013, 06:21pmPosts: 383 | Hey Lex, She is looking real good. I especially like the scarf joints you've incorporated into the wale. I hope to see more. | ||
Back to top | | ||
qwerty2008 |
| ||
![]() Registered Member #1095 Joined: Thu Aug 26 2010, 06:24pmPosts: 29 | Thanks Raymond: the scarf joints in the wales are only there because my planks weren't long enough but I may scribe more into the surface later to keep it from looking like the planks where 40 feet long. Lextin. | ||
Back to top | | ||
aew |
| ||
Arthur![]() ![]() ![]() Registered Member #1929 Joined: Wed Nov 30 2011, 03:05pmPosts: 3019 | Lextin: That's the reason they're there on the original! ![]() As Raymond says - real good. | ||
Back to top | | ||
Go to page 1 2 | |
Powered by e107 Forum System